unterstützt durch

KFAS New Headquarters in Kuwait

Projektwettbewerb

Kurzbeschrieb Bauaufgabe

KFAS is arranging an international competition for the design of its new Headquarters and Convention Center. Each building shall have an approximate net utilization area of 11,000 sqm.

The competition is not limited to the design of the Headquarters and Convention Center buildings, the scope should rather include the development of the entire area into a science-oriented district integrating adjacent science and technology functions that are currently in the area. The master plan for the area shall establish strong spatial connections between the new buildings and open spaces with quality ("Interconnecting Zone").

This competition and the realized projects are expected to become a future model for developments in the Gulf region. An awareness of the cultural and social context of the Gulf, and of Kuwait, through previous works is highly valued.

KFAS expects that the submitted designs are forward-looking, innovative and cost-efficient, with inclusion and high regard for sustainability targets in the design and construction of the site. The new buildings should offer a flexible and modern working environment for the commissioned staff.

The competition invites professional teams from all over the world to apply for the challenge of designing the new KFAS Headquarters and Convention Center. Through the launch of its very first international competition, KFAS envisions to generate science and technology-based designs for its building, as well as develop the area into a national science and technology zone.



Eckdaten

Ort
Kuwait
Auftraggeber (Auslober)
Kuwait Foundation for the Advancement of Science (KFAS)
Bauherrschaft
Kuwait Foundation for the Advancement of Science (KFAS)
Verfahrensbegleitendes Büro
[phase eins].
Baukategorie nach SIA102
Unterricht, Bildung und Forschung
Art der Aufgabe
Erweiterung, Neubau
Beschaffungsform (nach SIA)
Projektwettbewerb
Sprache des Verfahrens
English
Anonymes Verfahren
Ja
Art des Verfahrens
Selektives Verfahren
Stufen
Zweistufig
Fachgebiet Federführung
Architektur
Regionale Einschränkung
Internationaler Wettbewerb
Quelle Ausschreibungstext
KFAS: New Headquarters in Kuwait, Procedure. 26.03.2018. www.phase1.de/kfas

Termine

26.03.18
Datum Publikation
16.04.18
Anmeldung

Resultat

1. Rang
1. Preis
Teamname
Topotek 1 GmbH
Architektur
Topotek 1 Gesellschaft von Landschaftsarchitekten mbh
 

Jurymitglieder

Fachleute
Markus Allmann, Architect at Allmann Sattler Wappner Architects, TU Stuttgart, Munich (Germany) (Mitglied mit Stimmberechtigung)
Prof. Nezar AlSayyad, Architect, UC Berkeley, Berkeley (USA) (Mitglied mit Stimmberechtigung)
Prof. Amale Andraous, Architect at Work Architecture, Colombia University, UIA representative, New York (USA) (Mitglied mit Stimmberechtigung)
Prof. Hasan-Uddin Khan, Architect, Roger Williams University, Bristol (USA) (Mitglied mit Stimmberechtigung)
Prof. Mark Mack, Architect, UC Los Angeles, Los Angeles (USA) (Mitglied mit Stimmberechtigung)
Sachverständige
Abdlatif Yousef Al-Hamad, Chairman of the Board of Directors General of the Arab Fund for Economic and Social Development, Kuwait City (Mitglied mit Stimmberechtigung)
Ahmed Abdullah Al-Manfouhi, Engineer, Director General of Kuwait Municipality, Salmiya (Mitglied mit Stimmberechtigung)