This is a mirror of the official notice published on the following website: View Notice | ECEPP
Design and built of a new boiler house (total capacity of 10 MW biomass boiler + 10 MW natural gas boiler as a backup)
Design and built of the following items:
1) Installation of the new district heating network (pipeline).
2) Installation of the heating substations including the software.
3) Construction of the new biomass storage