Jaipur Metro (Phase II)
Projektwettbewerb
Kurzbeschrieb Bauaufgabe
THE JAIPUR METRO RAIL PROJECT
The project is planned along two corridors. The East-West Corridor and the North-South Corridor. The East-West Corridor from Mansarovar to Badi Chaupar, with a total length of 12.067 Kms. is being executed as phase-I of the project. The North-South Corridor from Ambabari to Sitapura with a total length of 23.099 Kms. Shall be taken up as phase-II of the project.
The project is planned along two corridors. The East-West Corridor and the North-South Corridor. The East-West Corridor from Mansarovar to Badi Chaupar, with a total length of 12.067 Kms. is being executed as phase-I of the project. The North-South Corridor from Ambabari to Sitapura with a total length of 23.099 Kms. Shall be taken up as phase-II of the project.
Eckdaten
Auftraggeber (Auslober)
Jaipur Metro Rail Corporation Ltd.
Baukategorie nach SIA102
Verkehrsanlagen
Art der Aufgabe
Neubau
Beschaffungsform (nach SIA)
Projektwettbewerb
Sprache des Verfahrens
English
Anonymes Verfahren
Nein
Fachgebiet Federführung
Bauingenieurwesen
Weitere Fachgebiete
Architektur
Regionale Einschränkung
Internationaler Wettbewerb
Quelle Ausschreibungstext
https://jaipurmetrorail.in/Current%20Tenders
Termine
22.06.16 Datum Publikation |