Retour

Archivé

Jizhou High-speed Railway

Ideenstudie

24.10.2018

Date de publication

28.10.2018

Anmeldung

Jizhou High-speed Railway

Tâche de construction

Space Planning and Design Team The team shall have the expertise in the following aspects, namely regional development background and policy researches, site condition analysis, international case study and summary, forward-looking overall regional development positioning and strategy making, regional image positioning, land use layout and spatial design. Industry Planning Team The team shall have the expertise in the following aspects, namely analysis and assessment of existing industries in the region and the peripheral areas, studies on macro background and industrial development conditions, analysis of existing demographic structure and future population introduction, making of population introduction strategy, overall industry positioning and strategy making, products planning, operation model planning, investment and revenue evaluation.

Données clés

Ville

Jizhou

Organisateur

People’s Government of Jizhou District

Maître d'ouvrage

People’s Government of Jizhou District

Bureau d\'accompagnement de la procédure

Syndicate CBC (China Building Centre) | Urban Enviroment Design (UED) Magazine

Type de tâche

Neubau

Type de passation

Ideenstudie

Langue

Allemand

Type de procédure

procédure sélective

Discipline principale

Raumplanung

Autres disciplines

Ökologie, Städtebau, Umweltingenieur, Verkehrsplanung

Résultat

Recommandé

Team

China Academy of Urban Planning & Design + Ernst & Young Global Limited (China)

Raumplanung

China Academy of Urban Planning & Design

Recommandé

Team

HHDesign + Shenzhen Yonghe Tianyuan Tourism Planning Limited

Raumplanung

HHDesign

Recommandé

Team

AECOM (Beijing) + Beijing Municipal Engineering Consulting Corporation

Raumplanung

AECOM (Beijing)

Recommandé

Team

Spark Architects + Colliers International

Raumplanung

Spark Architects