Jaipur Metro (Phase II)

Projektwettbewerb

22.06.2016

Date de publication

Jaipur Metro (Phase II)

Tâche de construction

THE JAIPUR METRO RAIL PROJECT The project is planned along two corridors. The East-West Corridor and the North-South Corridor. The East-West Corridor from Mansarovar to Badi Chaupar, with a total length of 12.067 Kms. is being executed as phase-I of the project. The North-South Corridor from Ambabari to Sitapura with a total length of 23.099 Kms. Shall be taken up as phase-II of the project.