Retour

Terminé Appel d'Offres

Design and Build of new Boiler House

30.10.2025

Date de publication

30.10.2025

Fragerunde

Description

This is a mirror of the official notice published on the following website: View Notice | ECEPP

Design and built of a new boiler house (total capacity of 10 MW biomass boiler + 10 MW natural gas boiler as a backup) 

Design and built of the following items:

1) Installation of the new district heating network (pipeline).

2) Installation of the heating substations including the software.

3) Construction of the new biomass storage

Données clés

Ville

Pale

Organisateur

Municipality of Pale

Catégories de construction

Installations tecniques

Type de tâche

Nouvelle construction

Type de passation

Appel d'Offres

Langue

Anglais

Type de procédure

procédure ouverte

Discipline principale

Architecture

Autres disciplines

Génie civil, Génie de l'environnement, Électricité, Technique du bâtiment

Source du texte de l\'appel d\'offres

simap.ch