Retour

Archivé

BIS site development

Projektstudie

21.06.2021

Date de publication

06.08.2021

Anmeldung

20.09.2021

Ausgabe der Wettbewerbsunterlagen

24.05.2022

Abgabe der Wettbewerbsbeiträge

BIS site development

Tâche de construction

The Bank for International Settlements, situated in the heart of Basel and in the centre of Europe, acts as a regular forum for meetings of its constituency of central bankers, financial regulators and supervisory authorities. Over the last decades, the BIS has extended its presence in Basel as its activities have grown. This expansion has been accommodated over the last decades through the acquisition of premises in close proximity to the Tower. The current facilities are concentrated in two major locations in Basel, the Tower site and the site of the Botta building. With the exception of the Tower building, the buildings on the Tower site are aging and inefficient or cannot be used at all, requiring the Bank to rebuild at some stage. Therefore, to ensure sufficient flexibility to meet demands over the coming decades, the Bank is looking to modernise its current facilities to support new ways of working and bring all its Basel-based staff into one location to foster collaboration. The project study will consider two different phases with the main focus on the first stage in the development of the future building extension, the “New Development”. The BIS envisages a possible further building extension at a later stage, the “Second-stage Development”. The masterplan, which was approved in 2015, enables the BIS to realise on the site around and including the existing Tower building an overall of 68,000 m² gross floor area (BGF) above ground in order to consolidate the entire BIS staff from all facilities in Basel in one place. Within both the constraints regarding the extension of the facilities and the implementation of the new masterplan in two stages, the BIS has initiated this project study in order to seek the most suitable project for the future home of the BIS in Basel. Download of the pre-qualification documents and application is possible through the project study homepage www.bis-campus.org.

Données clés

Ville

Basel

Canton

Bâle-Ville

Organisateur

Bank for International Settlements

Bureau d\'accompagnement de la procédure

Drees & Sommer Schweiz AG

Type de tâche

Erweiterung, Sanierung, Umbau

Type de passation

Projektstudie

Langue

Allemand

Type de procédure

procédure sélective

Étapes

en une étape

Discipline principale

Architektur

Autres disciplines

Elektroingenieurwesen, Bauingenieurwesen, Bauleitung / Baumanagement, Bauökonomie / Kostenplanung, HLKK-Ingenieurwesen, Haustechnik, Sanitäringenieurwesen

Disciplines optionnelles

Innenarchitektur, Nachhaltigkeitsplanung

Restriction régionale

Internationaler Wettbewerb

Source du texte de l\'appel d\'offres

www.bis-campus.org. 21.06.2021.

Membres du jury

Fachleute

Sacha Menz

(chairperson) - architect based in Zurich and professor at ETH Zurich (Swiss Federal Institute of Technology)

Beat Aeberhard

Head of Urban Development and Architecture of the Canton of Basel-Stadt

Christophe Girot

landscape architect based in Zurich and professor at ETH Zurich

Louisa Hutton

architect based in Berlin and former lecturer/visiting professor at Architectural Association in London and Harvard Graduate School of Design in Cambridge, Massachusetts

Vittorio Magnago Lampugnani

architect based in Milan and professor emeritus at ETH Zurich

Débora Mesa Molina

architect based in Madrid and Boston and lecturer at the School of Architecture of the Georgia Institute of Technology in Atlanta

Sachverständige

Thomas Jordan

member of the BIS Board of Directors and the Board's Administrative Committee, Chairman of the Governing Board of the Swiss National Bank

Luiz Awazu Pereira da Silva

Deputy General Manager, BIS

Monica Ellis

Secretary General and Head of General Secretariat, BIS

Bertrand Legros

Deputy Secretary General, BIS

Véronique Neiss

Head of Real Estate and Facility Management, BIS